This is the original design tweaked after our June meeting.
Includes:
- Change to fence in front of garage door.
- Change in location of the entrance from the parking area.
- Removal of additional gate for garbage.
Your Custom Text Here
This is the original design tweaked after our June meeting.
Includes:
- Change to fence in front of garage door.
- Change in location of the entrance from the parking area.
- Removal of additional gate for garbage.
- Tweak design to show:
1. change in layout of fence at front
2. New gate position
3. Path in gravel alongside house
- Draw details of fence and provide rough estimate
- Proposed fee for drawing lean-to utilities area
- Estimate time to date and future time to finish design